Refusals
Claims refused after installation are usually refused on causation instead of on damage.
Open11 September 2026
The pre-installation record is six frames per piece: the carton label, the piece on all four sides, the underside and any fault.
It takes four minutes a piece and it is the single document that decides most claims. Without it, every fault becomes a question about when it appeared. The underside is the frame that matters most, because fixing damage and joint faults both show there.
Name the files by carton and model so the record can be searched a year later without opening folders one by one.
Claims fail on evidence. The fair complaint with no photographs goes nowhere. Photographs with no date, no carton number and no model code are stories rather than claims. The claim window is set by the contract and shortened by use. Anything found after installation has to be shown to be a manufacturing fault instead of an installation one.
Short shipment and wrong model are the two claims that are easiest to prove and most often raised late. Both should be caught in the first hour. Missing hardware is a packing claim, and it is settled with a courier. Photograph the carton label and the contents together.
The claims that get refused are the ones raised after installation without a pre-install photograph. That single image decides most of them. Claims stall when the factory cannot reproduce the problem. Photographs of the actual joint or seam, in focus, resolve in a day what a description cannot resolve in a week.
Replacement parts need the model code, the carton and the date. Without all three the factory cannot match the batch, and a mismatched part is a second claim. The container number belongs on every photograph and every email. Six months later it is the only thing that ties a damaged chair to a shipment, because carton numbers repeat across orders.
Four photographs per fault is the minimum: the label, the fault in place, the fault close up with a scale, and the dining area. The claim that arrives with twelve photographs of one corner and none of the label stalls for a week. Every model sits inside the steakhouse range.
Rejecting a whole container is the most expensive claim available. It costs the freight both ways, the duty and the opening date. That is why it is reserved for faults that make the goods unsellable.
Spare parts shipped ahead solve most claims faster than a settlement. The hinge that arrives in four days closes the issue. The credit note that arrives in six weeks does not. Claims reviewed once a year show patterns nobody sees in a single file. The three faults that recur turn into a specification change, which is cheaper than settling them annually. Bench lengths and depths sit under steakhouse bench seating.
Yes, as long as the files are kept at full size and named. The camera matters less than the naming.
Claims refused after installation are usually refused on causation instead of on damage.
OpenThe claim window is set by the contract and shortened by use.
OpenSite contact protocol for a furniture delivery gives the crew a drawing, a sequence and a named person on site.
OpenWhat to open first, how to photograph it and what a factory will accept.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp