Tolerance
Dimension disputes are settled by the tolerance written on the drawing. The tape measure on site measures the wall, and the wall was never the contract.
Open12 August 2026
Missing hardware is a packing claim, proved by the carton rather than by the dining area.
Screw bags sit inside a labelled bag inside a labelled carton, so a missing bag points to a packing step that was skipped. Photograph the open carton with the label in frame, and the replacement ships without a discussion. Hardware counted at packing against the bill of materials turns a missing bag into a packing error that can be traced to a shift.
Loose screws in a carton are worse than missing ones, because they arrive as damage to the piece they were packed with.
Photograph the carton before opening it. Damage that happened in transit looks different from damage that happened at unpacking, and only one of them is the factory's. Missing hardware is a packing claim, and it is settled with a courier. Photograph the carton label and the contents together.
The claims that get refused are the ones raised after installation without a pre-install photograph. That single image decides most of them. The first hour on site should be a count and a walk. Count cartons, open three, photograph what is inside, and note anything that will need a claim later.
Gaps in the evidence appear later. Missing carton labels or a discarded packing list turn a clear claim into a negotiation. Replacement parts need the model code, the carton and the date. Without all three the factory cannot match the batch, and a mismatched part is a second claim.
The container number belongs on every photograph and every email. Six months later it is the only thing that ties a damaged chair to a shipment, because carton numbers repeat across orders. Four photographs per fault is the minimum: the label, the fault in place, the fault close up with a scale, and the dining area. The claim that arrives with twelve photographs of one corner and none of the label stalls for a week. Every model sits inside the steakhouse range.
Insurance and factory claims run on different clocks and different evidence. The insurance claim needs the loading photographs and the survey. The factory claim needs the carton and the count. Third party inspection reports carry weight because they are written by someone with nothing to sell. The same findings in a buyer's email are a position instead of a finding.
Responsibility divides at three points: the factory door, the vessel and the site. Damage that shows at the door is packing. Damage that shows after unloading is handling, and the photographs decide which. Packing faults have to be proved with the carton. The photograph of the chair shows damage, and a photograph of the carton shows why. The carton with 10 mm of foam around a 25 kg top explains the damage. The same carton thrown away explains nothing. Every timber bench is listed under solid timber benches.
For a standard bolt, yes, and it is faster than a shipment. For a bracket that aligns a table base, no, because the hole pattern is specific to the model.
Dimension disputes are settled by the tolerance written on the drawing. The tape measure on site measures the wall, and the wall was never the contract.
OpenHide dye lot variation is a property of the material instead of a defect.
OpenKnock-down packing trades container space for assembly and for joints.
OpenWhat to open first, how to photograph it and what a factory will accept.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp