Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Parts

The replacement part needs three references: model, batch and carton.

Replacement part requests need the model code, the carton number and the delivery date, and without all three the factory cannot match the batch.

Needs
model, carton, date
Ask for
the part number
Two at once
arrive matched

Counting and checking

Matching matters because a leg from a different run can differ in finish by a shade that shows on a chair. Descriptions such as the left back leg are a starting point. Without a photograph they are a guess with a name on it. Ask for the part number from the bill of materials rather than the part name, because names vary between factories and numbers do not.

Two parts shipped together from one batch arrive matched. One part shipped later may not, which is worth knowing before accepting it.

The claims that get refused

Count against the packing list at the dock, before anything moves. Counts done after the goods are distributed cannot be checked. Short shipment and wrong model are the two claims that are easiest to prove and most often raised late. Both should be caught in the first hour.

Colour mismatch claims need a physical sample and the lot number. Photographs of two covers under different lighting prove nothing on their own. Gaps in the evidence appear later. Missing carton labels or a discarded packing list turn a clear claim into a negotiation.

What to photograph

Trial assembly of one run before installing all of them catches specification errors while they are still cheap. Inspection order matters: cartons, then count, then three opened, then dimensions, then finish, then assembly. Each step closes a question the next step depends on.

Settlement is usually parts. Replacing a whole booth for one torn cover is rare. Knowing that in advance sets expectations and shortens the argument. Keep one carton unopened until the end of the install. It is the reference for everything that was in the shipment. Sizes, finishes and lead times are set out across steakhouse seating.

How to check it on a sample

Send the factory a short list with photographs and carton numbers. Long emails with a general complaint get a general answer. Claims read best as one page and three tables. What was ordered, what arrived, what is wrong, with carton numbers in the first column, settles more than three pages of narrative.

Third party inspection reports carry weight because they are written by someone with nothing to sell. The same findings in a buyer's email are a position instead of a finding. Spare parts shipped ahead solve most claims faster than a settlement. The hinge that arrives in four days closes the issue. The credit note that arrives in six weeks does not. Bench lengths and depths sit under steakhouse bench seating.

One more question

How long does a part take?

Two to four weeks by air for a small part, and the same lead time as a chair by sea. For an opening date, air is usually the cheaper choice.

Liability

Carrier liability covers what happened between the loading dock and the door.

Open

The label

The carton label carries the model, the quantity, the carton number and often the batch.

Open

Touch-up

Finish touch-up on site is what stops a chip becoming a replacement.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→