Pre-shipment
Pre-shipment inspection findings are the only claims that cost nothing, because the piece never leaves the factory.
Open10 November 2026
The delivery note signature is a statement about condition, and signing it clean is a statement that the cartons were sound.
Writing unexamined or three cartons crushed above the signature keeps the claim open without delaying the driver. The driver will wait for a sentence and will not wait for an inspection. Signing for a count and signing for condition are different acts, and the note usually has one line for both.
Writing the count on the note in words and figures stops the number being questioned later.
Open three cartons. Thirty is checking, and three is sampling. The first three tell you whether the batch is right. The rest tell you the same thing more slowly.
Count against the packing list at the dock, before anything moves. Counts done after the goods are distributed cannot be checked.
Colour mismatch claims need a physical sample and the lot number. Photographs of two covers under different lighting prove nothing on their own. Dimensional tolerance is ±2 mm. Claims sit at 3 mm. 1.5 mm is inside the tolerance both sides signed.
Inspection order matters: cartons, then count, then three opened, then dimensions, then finish, then assembly. Each step closes a question the next step depends on. Settlement is usually parts. Replacing a whole booth for one torn cover is rare. Knowing that in advance sets expectations and shortens the argument.
The response deadline belongs in the contract. The email thread is not a record anyone can be held to. Fourteen days to answer a claim and thirty to settle is a clause that keeps a file moving without anybody chasing. Damage rates are worth tracking per container.
The order average hides the one bad carton. The line that sits at two percent for a year and jumps to nine percent is telling you about a packer. Luck moves a price by a point or two.
Rejecting a whole container is the most expensive claim available. It costs the freight both ways, the duty and the opening date. That is why it is reserved for faults that make the goods unsellable. Every model sits inside the steakhouse range.
Spare parts shipped ahead solve most claims faster than a settlement. The hinge that arrives in four days closes the issue. The credit note that arrives in six weeks does not. Open claims should not hold a reorder. The reorder placed while a claim is open is the reorder that gets priority, and the claim is settled on its own timetable.
Claim letters work when they carry facts and no adjectives. The paragraph that describes what was seen and what is expected gets an answer. The paragraph about disappointment gets forwarded. Every timber bench is listed under solid timber benches.
Rarely, and a refusal is itself worth noting. Call the carrier office while the driver is still at the door and note the time of the call.
Pre-shipment inspection findings are the only claims that cost nothing, because the piece never leaves the factory.
OpenWarranty and transit damage are separate promises with separate clocks.
OpenShipping marks on furniture cartons should carry the order number, the carton number of the total, the dining area or zone, and the model.
OpenWhat to open first, how to photograph it and what a factory will accept.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp