The clause
The claim window is set by the contract and shortened by use.
Open5 September 2026
Claims refused after installation are usually refused on causation rather than on damage.
Once a piece is fixed, dragged or loaded by guests, the factory can argue that the fault arrived after handover. Pre-installation photographs and a note of the installation date are what keep that argument open. Note the installation date against the model and the carton, because the claim is dated from the piece instead of from the dining area.
Damage that follows a fixing point is read as installation damage, and damage away from it is read as transit.
Claims fail on evidence. The fair complaint with no photographs goes nowhere. Photographs with no date, no carton number and no model code are stories instead of claims. The claim window is set by the contract and shortened by use. Anything found after installation has to be shown to be a manufacturing fault instead of an installation one.
Short shipment and wrong model are the two claims that are easiest to prove and most often raised late. Both should be caught in the first hour. The claims that get refused are the ones raised after installation without a pre-install photograph. That single image decides most of them.
Claims stall when the factory cannot reproduce the problem. Photographs of the actual joint or seam, in focus, resolve in a day what a description cannot resolve in a week. Replacement parts need the model code, the carton and the date. Without all three the factory cannot match the batch, and a mismatched part is a second claim.
Send the factory a short list with photographs and carton numbers. Long emails with a general complaint get a general answer. Four photographs per fault is the minimum: the label, the fault in place, the fault close up with a scale, and the dining area. The claim that arrives with twelve photographs of one corner and none of the label stalls for a week. All 829 models are listed on the steakhouse furniture page.
Claims read best as one page and three tables. What was ordered, what arrived, what is wrong, with carton numbers in the first column, settles more than three pages of narrative. Responsibility divides at three points: the factory door, the vessel and the site. Damage that shows at the door is packing. Damage that shows after unloading is handling, and the photographs decide which.
Packing faults have to be proved with the carton. The photograph of the chair shows damage, and a photograph of the carton shows why. The carton with 10 mm of foam around a 25 kg top explains the damage. The same carton thrown away explains nothing. Open claims should not hold a reorder. The reorder placed while a claim is open is the reorder that gets priority, and the claim is settled on its own timetable. Runs are set out under hearth benches.
It ends the transit claim and leaves the manufacturing one. The two are separate promises and the contract should say so in two places.
The claim window is set by the contract and shortened by use.
OpenConcealed damage is damage a carton does not show, and it needs the carton kept as evidence instead of flattened.
OpenPowder coat colour matching across a reorder is unreliable beyond about eighteen months.
OpenWhat to open first, how to photograph it and what a factory will accept.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp