Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Liability

The carrier answers for handling, the factory for packing.

Carrier liability covers what happened between the loading dock and the door, and it is limited by weight rather than by value.

Covers
dock to door
Limited by
weight
Baseline
loading photographs

What to open first

That limit is usually below the value of a chair. That is why the packing has to carry the argument for the rest. Knowing the limit before the truck arrives tells you which claim you actually have. Liability is calculated per kilogram in most freight terms, so a light chair recovers less than a heavy one for the same damage.

Loading photographs from the factory are the baseline the carrier is measured against, and without them the comparison starts at the door.

Where claims fail

Open three cartons. Thirty is checking, and three is sampling. The first three tell you whether the batch is right. The rest tell you the same thing more slowly.

Count against the packing list at the dock, before anything moves. Counts done after the goods are distributed cannot be checked.

Colour mismatch claims need a physical sample and the lot number. Photographs of two covers under different lighting prove nothing on their own. Claims stall when the factory cannot reproduce the problem. Photographs of the actual joint or seam, in focus, resolve in a day what a description cannot resolve in a week.

What evidence works

Settlement is usually parts. Replacing a whole booth for one torn cover is rare. Knowing that in advance sets expectations and shortens the argument. Four photographs per fault is the minimum: the label, the fault in place, the fault close up with a scale, and the dining area. The claim that arrives with twelve photographs of one corner and none of the label stalls for a week.

Third party inspection reports carry weight because they are written by someone with nothing to sell. The same findings in a buyer's email are a position instead of a finding.

Rejecting a whole container is the most expensive claim available. It costs the freight both ways, the duty and the opening date. That is why it is reserved for faults that make the goods unsellable. Our steakhouse furniture covers every model, size and finish.

What it costs at year five

Responsibility divides at three points: the factory door, the vessel and the site. Damage that shows at the door is packing. Damage that shows after unloading is handling, and the photographs decide which. Packing faults have to be proved with the carton.

The photograph of the chair shows damage, and a photograph of the carton shows why. The carton with 10 mm of foam around a 25 kg top explains the damage. The same carton thrown away explains nothing.

Claim letters work when they carry facts and no adjectives. The paragraph that describes what was seen and what is expected gets an answer. The paragraph about disappointment gets forwarded. Photograph metadata is evidence and chat compression removes it. The original files kept on the phone are dated. The same picture sent through an app arrives without a timestamp. Runs are set out under hearth benches.

One more question

Is insurance the same as liability?

No. Liability is what the carrier owes by default and insurance is what was bought on top. The claim route differs and the paperwork differs with it.

The label

The carton label carries the model, the quantity, the carton number and often the batch.

Open

Before fixing

The pre-installation record is six frames per piece: the carton label, the piece on all four sides.

Open

Wall fixing

Booth runs fix to a wall either through the back into studs, through the plinth into the floor.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→