The pieces that had to fit the stair.
OpenThe ground floor was the easy half. Everything above it had to pass a 1,100 mm stair with a turn at the top, and that turn is what decided the length of every bench in the building.
One 2,400 mm bench does not go round a turn on a 1,100 mm stair, however many people carry it. The plan showed the stair and not the turn. That is why the first drawing had three runs that could not reach the first floor.
Every run above ground level went out in two sections with a bolted splice under the seat rail. The splice is invisible once the cushion is on, and it costs a little less than rebuilding the stair.
The upper floor of a converted building carries less than a ground floor with a slab under it, and a booth run is heavier than it looks because the plinth is weighted. Seven runs at four seats distributed across two floors was the number that worked without a structural survey.
Where a run had to sit over a joist span rather than a wall, the plinth was built hollow and the weight moved into the back. Same run on plan, different section under the seat, and it is the reason a run cannot be reordered from a photograph.
One 40HQ, loaded in six hours, with the runs against the walls and the chairs stacked four to a carton down the middle. The upper-floor sections went in last so they came out first at the other end.
Twenty-eight days from signed sheet to loading. Two covers and one glide set per thirty units travelled inside the last carton, which on a sixty-two seat dining area is two spare covers instead of four.







Runs built as one piece can be cut and spliced, and they will never be as stiff at the joint. Splitting it at the drawing stage costs nothing. Splitting it later costs the recover on that section.
The pieces that had to fit the stair.
OpenThe layout this dining area used upstairs.
OpenWhich cartons to open first.
OpenTimber at 8 to 12 percent moisture content stays where it was machined in a conditioned dining area.
OpenThe retained sample is the approved piece kept from the order.
OpenInstallation method statement for furniture runs to one page: access, sequence, fixings, protection and who signs off.
OpenWarehouse receiving is the first and best inspection point.
OpenPort to door delivery adds about seven days to a transit and introduces the last mile.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp