Sixty-two seats up a stair that is 1,100 mm wide.

The ground floor was the easy half. Everything above it had to pass a 1,100 mm stair with a turn at the top, and that turn is what decided the length of every bench in the building.

Seats
62, over two floors
Booth runs
7 runs, 4 seats each
Stair width
1,100 mm, with a turn
Lead time
28 days, one loading

The stair is a dimension the plan does not show

One 2,400 mm bench does not go round a turn on a 1,100 mm stair, however many people carry it. The plan showed the stair and not the turn. That is why the first drawing had three runs that could not reach the first floor.

Every run above ground level went out in two sections with a bolted splice under the seat rail. The splice is invisible once the cushion is on, and it costs a little less than rebuilding the stair.

Weight decided the upper floor

The upper floor of a converted building carries less than a ground floor with a slab under it, and a booth run is heavier than it looks because the plinth is weighted. Seven runs at four seats distributed across two floors was the number that worked without a structural survey.

Where a run had to sit over a joist span rather than a wall, the plinth was built hollow and the weight moved into the back. Same run on plan, different section under the seat, and it is the reason a run cannot be reordered from a photograph.

What thirty-four chairs and seven runs look like on one loading

One 40HQ, loaded in six hours, with the runs against the walls and the chairs stacked four to a carton down the middle. The upper-floor sections went in last so they came out first at the other end.

Twenty-eight days from signed sheet to loading. Two covers and one glide set per thirty units travelled inside the last carton, which on a sixty-two seat dining area is two spare covers instead of four.

What shipped7 pieces  Every model →

One more question

Can a bench be split after it is built?

Runs built as one piece can be cut and spliced, and they will never be as stiff at the joint. Splitting it at the drawing stage costs nothing. Splitting it later costs the recover on that section.

Bench rows

The pieces that had to fit the stair.

Open

Wall runs

The layout this dining area used upstairs.

Open

Moisture content

Timber at 8 to 12 percent moisture content stays where it was machined in a conditioned dining area.

Open

The sample

The retained sample is the approved piece kept from the order.

Open

Method statements

Installation method statement for furniture runs to one page: access, sequence, fixings, protection and who signs off.

Open

Receiving

Warehouse receiving is the first and best inspection point.

Open

Port to door

Port to door delivery adds about seven days to a transit and introduces the last mile.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→