Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Design/Wall banquette runs

Wall runs: measure the wall and ignore the floor area.

Long runs are the cheapest seat in the dining area per head and the easiest to get wrong. The wall decides the length, and the wall is never the number on the architect's sheet.

Seat pitch
600 mm per seat
Run lengths
1,500 / 1,800 / 2,400 mm
Filler panel
40 mm, one per run
Door clearance
900 mm, knocked down
The grey tufted booth run on a birch plinth

600 mm, and why not 550

Pitch on a banquette run is 600 mm because two adults at 550 are touching shoulders through a two-hour dinner. Below 600 the run seats fewer people than the drawing claims, and the dining area opens with a table that cannot be sold.

Measure between finished faces, after plaster and after skirting. 1,500 mm of run into a 1,540 mm opening moves 40 mm of filler and is fine. The same run into a 1,480 mm opening is a return trip.

One filler panel, always

Walls are out of square in every building older than ten years. Each run ships with a 40 mm filler and a scribe rail, so the last 40 mm is planed on site instead of hidden behind sealant that cracks in a year.

Fillers cost less than a remake and they travel in the same crate. There is no second shipment to chase and no week of an empty wall.

The part the cleaner needs

Toe kick lifts out without tools on every run. Without it the floor line under a banquette gets cleaned by dragging a mop along the front lip, and that is what wears the cover at the bottom edge first.

15 mm of clearance behind the run lets air move and stops the back panel holding moisture against a cold wall, which is how a hide back goes mouldy in a coastal dining area without anyone noticing until spring.

Built for this position

One more question

How is a run cut to a wall that is 1,520 mm?

To the measured dimension, with the filler taking the last 40 mm. Send the opening at three heights. Plaster, skirting and floor can differ by 20 mm, and the narrowest of the three decides the build.

PU or hide

PU against leather is a cost comparison that changes over ten years.

Open

Seat width

Bench seat width runs 600 mm per person on a banquette and 550 mm where the run is tight.

Open

Samples

Furniture sample cost runs 1.5 to 2 times the production price of the piece.

Open

Cushion fixing

Booth cushions are either fixed to the seat deck with velcro, screwed through a tab, or stapled permanently.

Open

Colour matching

Leather colour matching usually fails because the light is different. Two drums of the same dye read apart under a window and together under a warm pendant.

Open

Fire treatment

Fire retardant treatment on leather changes how a cover behaves under ignition and changes the hand of the hide.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→