Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Port to door

Door delivery adds a week and a set of problems.

Port to door delivery adds about seven days to a transit and introduces the last mile, which is the least controlled part of the journey.

Added
about 7 days
Risk
the last mile
Questions
access, unloading, storage

Cartons, pallets and knock-down

The vehicle has to reach the door, somebody has to unload, and there has to be somewhere to put 20 cubic metres on arrival. Those three questions belong in the shipping plan. The delivery that arrives before the site is ready costs storage, and storage for furniture is usually outside.

The last mile is where a pallet that needs a forklift meets a site that has none.

Where losses happen

The 40 foot container holds about 68 cubic metres. At 0.19 m³ per packed chair that is roughly 320 chairs, and the number drops the moment a base or a stone top goes in. Moisture damage happens in transit. By the time the cartons are opened the timber has already taken the water. The container crossing two climate zones condenses water on the underside of a steel top, and the rust is there when the doors open.

Load plans are worth asking for before shipping. It shows the fill rate, the weight distribution and whether the last ten cartons actually fit. Transit time from South China to the west coast is about 18 to 25 days port to port, and door delivery adds a week. That week is where most schedules slip.

What to write on the order

LCL costs more per cubic metre and damages more. For anything over 8 m³ the numbers usually favour a full container even at part load. Desiccant is cheap insurance against condensation and is routinely left out. Two 100 g bags per cubic metre in a steel-heavy load is the difference between rust spots and none.

Delivery to site is the last mile and the least controlled. Confirm whether the vehicle can reach the door, who unloads and whether there is anywhere to put 20 m³ on arrival. Wood packaging needs the heat treatment mark stamped on the pallet. The pallet without an IPPC stamp gets the container held at the destination port for a week. All 829 models are listed on the steakhouse furniture page.

What the sample should prove

Inland trucking has a height limit before it has a weight limit. The container that leaves the port legally can still hit a bridge on the last 30 km, and the route survey is the buyer's job. Unloading equipment belongs in the delivery plan. The 40 foot container of seating needs a dock or a forklift. Without either, the driver waits and the wait is charged by the hour.

Damage clusters at both ends of the journey. Loading damage shows as crushed corners at the door end. Unloading damage shows as scrapes on the cartons handled last. Part shipments cost more per unit and less per week. Splitting an order to hit an opening date is normal. Splitting it three ways without telling the forwarder is how the third batch arrives after the opening. Capacity and lead times are explained on the Ember & Chair workshop.

One more question

Should I take port to door?

On a first order, yes, because it removes a set of unknowns. On a repeat, port to port with a known agent is often cheaper.

Desiccant

Desiccant in a shipping container runs at about 200 grams per cubic metre of load for a 30 day transit, which for a 68 cubic metre container is roughly 14 kilograms.

Open

Moisture

Moisture protection in a container is about condensation rather than rain.

Open

Sample approval

Leather sample approval should cover thickness, backing, hand and colour.

Open

Packing and freight

Cartons, knock-down, container fill, documents and what arrives damaged.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→