Shipping transit from south China runs about 18 to 25 days port to port to the west coast and 28 to 35 days to Europe, and door delivery adds a week at each end.
Open16 October 2026
Warehouse receiving is the first and best inspection point, because the cartons are still together and the count can be checked against the packing list.
The count done after the goods are distributed cannot be verified. The receiving step should photograph the load and record any carton damage on the delivery note. The signature on a delivery note without a count is a signature that accepts the shipment as delivered.
Carton damage noted at receiving is a claim. The same damage found a week later is a discussion.
Spares packed separately get lost. Spares packed inside the last carton arrive with the order because they are part of it. Loose hardware in a carton is a claim waiting to happen. Every screw bag should be inside a labelled bag inside a labelled carton, or the first fix on site stops.
Loading sequence is a delivery sequence. Whatever comes off last goes in first, and on a multi-dining area order that is what keeps the install in phase. Customs documentation errors cost more time than duty costs money. The HS code, the description and the value have to match across the invoice, the packing list and the entry.
Forwarders who quote a rate without asking about carton dimensions are quoting a guess. Volume, weight and stackability all change the number. Carton outer dimensions have to clear the container door. Comparing against the internal width alone hides the door height. The carton that fits the floor by 20 mm and misses the door by 40 mm is a carton that gets rebuilt on the dock.
Carton weight should stay under 25 kg for two reasons: one person lifts it, and the compression on the bottom carton stays inside what a double wall can take. Wood packaging needs the heat treatment mark stamped on the pallet. The pallet without an IPPC stamp gets the container held at the destination port for a week. Every model sits inside the steakhouse range.
Lashing points are part of the packing design. The cartons braced against the container rings travel. The same cartons relying on friction arrive shifted and corner damaged. Pallet footprints should be chosen against the container floor.
The 1,200 by 1,000 mm pallet loads eleven across a 40 foot floor. The 1,200 by 800 mm loads fourteen and wastes less of the same box.
Shipping marks go on two faces. The carton turned the wrong way in a container is invisible. The carton marked on the long face only is the carton that gets stacked with the mark against the wall and cannot be found without unloading. Part shipments cost more per unit and less per week. Splitting an order to hit an opening date is normal. Splitting it three ways without telling the forwarder is how the third batch arrives after the opening. Capacity and lead times are explained on the Ember & Chair workshop.
Record it on the delivery note before signing. The short shipment noted at the dock is settled in a week. One found later takes a month.
Shipping transit from south China runs about 18 to 25 days port to port to the west coast and 28 to 35 days to Europe, and door delivery adds a week at each end.
OpenLCL and full container loading differ in cost per cubic metre and in damage risk.
OpenCarrier liability covers what happened between the loading dock and the door.
OpenCartons, knock-down, container fill, documents and what arrives damaged.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp