HS codes
Furniture HS codes split first by material and then by function.
Open28 September 2026
The freight forwarder books space, prepares documents and handles the port process, and the rate they quote depends on volume, weight and stackability.
The rate quoted without carton dimensions is a guess that will be adjusted. The forwarder also decides whether the load goes as a full container, which is where the cost is won. The forwarder with a relationship at the destination port solves problems that a cheaper one escalates.
The forwarder does not inspect the goods, so a quality problem is not their scope however many photographs they take.
Knock-down packing saves about 45 percent of volume on booth runs. That is the difference between 12 runs in a container and 20, and it moves the landed cost more than any price negotiation. Insurance claims need photographs at loading. Unloading photographs show the damage and not the cause. The condition at the port of origin is the baseline, and without it a claim becomes an argument.
Transit time from South China to the west coast is about 18 to 25 days port to port, and door delivery adds a week. That week is where most schedules slip. LCL costs more per cubic metre and damages more. For anything over 8 m³ the numbers usually favour a full container even at part load.
Carton dimensions are chosen against the container. The carton sized to the product alone wastes the space above it. Cartons that fit a product and waste 60 mm of container height waste more than they save. Fill rate is a design constraint. Table bases that nest save more container space than a 5 percent price cut saves money.
Forwarders who quote a rate without asking about carton dimensions are quoting a guess. Volume, weight and stackability all change the number. Carton outer dimensions have to clear the container door. Comparing against the internal width alone hides the door height. The carton that fits the floor by 20 mm and misses the door by 40 mm is a carton that gets rebuilt on the dock. Our steakhouse furniture covers every model, size and finish.
Empty space in a container is a load path. The void filled with air bags keeps the stack from shifting. The same void left open lets the front row walk into the doors on the first swell. Wood packaging needs the heat treatment mark stamped on the pallet. The pallet without an IPPC stamp gets the container held at the destination port for a week.
High cube or standard is a volume decision with a weight consequence. The extra 300 mm of height takes another two rows of cartons and raises the centre of gravity, which matters on a short sea leg. Delivered duty paid sounds like one number and is really four: freight, duty, clearance and the last mile. The quote that gives one figure without the breakdown is a quote nobody can audit. Capacity and lead times are explained on the Ember & Chair workshop.
Only if the buyer has no relationship. The factory's forwarder is convenient and works for the factory's schedule.
Furniture HS codes split first by material and then by function.
OpenCustoms documents for furniture are the commercial invoice, the packing list.
OpenBooth runs are built in lengths up to 2,400 mm and shipped in one piece where access allows.
OpenCartons, knock-down, container fill, documents and what arrives damaged.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp