Site delivery
Delivery to site depends on three facts that are rarely checked: whether a vehicle can reach the door, who unloads, and where the goods go on arrival.
Open28 October 2026
Container condensation forms where warm moist air meets a cold surface, and inside a loaded container that surface is the underside of a steel top or the inside of the roof.
Water then drips onto the load. Desiccant and a liner address it. Wrapping does not, because the water is already inside. The container loaded in humid weather carries the moisture in with the air and the pallets.
The pattern of damage is a line across the top of the load instead of random spots, which is how condensation is told apart from a leak.
Moisture damage happens in transit. By the time the cartons are opened the timber has already taken the water. The container crossing two climate zones condenses water on the underside of a steel top, and the rust is there when the doors open. Damage in transit is mostly handling damage, and most of it is at the ends of long pieces.
Booth backs and bench rails need end protection. Extra wrapping in the middle protects the part that never gets hit.
Spares packed separately get lost. Spares packed inside the last carton arrive with the order because they are part of it. Fill rate is a design constraint. Table bases that nest save more container space than a 5 percent price cut saves money.
The failures in transit are condensation, corner impact and load shift. Only one of those is fixed by more wrapping. Track the container itself. Vessel delays of four days are normal and invisible until one becomes a missed opening date.
The 20 foot container holds about 28 cubic metres and that is the right box for a small order. Filling a 40 foot to a third is paying for air above the goods. Carton weight should stay under 25 kg for two reasons: one person lifts it, and the compression on the bottom carton stays inside what a double wall can take. Our steakhouse furniture covers every model, size and finish.
Containers are inspected before loading, by hand, with a torch. Light coming through a side panel means water comes through it, and the cargo that arrives wet was loaded into a box with a hole. Lashing points are part of the packing design. The cartons braced against the container rings travel. The same cartons relying on friction arrive shifted and corner damaged.
Pallet footprints should be chosen against the container floor. The 1,200 by 1,000 mm pallet loads eleven across a 40 foot floor. The 1,200 by 800 mm loads fourteen and wastes less of the same box. Condensation comes from the cargo as much as the air. Timber packed at 14 percent moisture releases water inside a container crossing two climate zones. The desiccant is there for that water. Sea air is not what ruins a carton. Capacity and lead times are explained on the Ember & Chair workshop.
Condensation leaves a horizontal line at the same height across several cartons. The leak is local.
Delivery to site depends on three facts that are rarely checked: whether a vehicle can reach the door, who unloads, and where the goods go on arrival.
OpenWarehouse receiving is the first and best inspection point.
OpenPowder coating runs a part through a phosphate or blast prep, a spray.
OpenCartons, knock-down, container fill, documents and what arrives damaged.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp