Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/LCL or FCL

Past eight cubic metres the full container usually wins.

LCL and full container loading differ in cost per cubic metre and in damage risk.

Break point
about 8 m³
LCL
more handling, longer transit
FCL part load
often cheaper than LCL

How a load is built

LCL shares a container, which means the load is handled twice more and sits in a consolidation warehouse. Past about 8 cubic metres the numbers favour a full container even at part load, and the damage rate falls. Consolidation warehouses are where cartons get restacked by people who did not pack them, which is where corner damage comes from.

LCL transit is longer by a week or two, because the container waits for other cargo.

Moisture and impact

The 40 foot container holds about 68 cubic metres. At 0.19 m³ per packed chair that is roughly 320 chairs, and the number drops the moment a base or a stone top goes in. Moisture damage happens in transit. By the time the cartons are opened the timber has already taken the water. The container crossing two climate zones condenses water on the underside of a steel top, and the rust is there when the doors open.

Spares packed separately get lost. Spares packed inside the last carton arrive with the order because they are part of it. Marking matters more than most buyers expect. Cartons marked with the dining area they belong to get installed in the right order. Unmarked ones get opened twice.

What to agree before shipping

Transit time from South China to the west coast is about 18 to 25 days port to port, and door delivery adds a week. That week is where most schedules slip. Desiccant is cheap insurance against condensation and is routinely left out. Two 100 g bags per cubic metre in a steel-heavy load is the difference between rust spots and none.

The failures in transit are condensation, corner impact and load shift. Only one of those is fixed by more wrapping. The 20 foot container holds about 28 cubic metres and that is the right box for a small order. Filling a 40 foot to a third is paying for air above the goods. Sizes, finishes and lead times are set out across steakhouse seating.

Where the money goes

Containers are inspected before loading, by hand, with a torch. Light coming through a side panel means water comes through it, and the cargo that arrives wet was loaded into a box with a hole. Lashing points are part of the packing design. The cartons braced against the container rings travel. The same cartons relying on friction arrive shifted and corner damaged.

Damage clusters at both ends of the journey. Loading damage shows as crushed corners at the door end. Unloading damage shows as scrapes on the cartons handled last. Part shipments cost more per unit and less per week. Splitting an order to hit an opening date is normal. Splitting it three ways without telling the forwarder is how the third batch arrives after the opening. Capacity and lead times are explained on the Ember & Chair workshop.

One more question

Can I ship 12 cubic metres LCL?

You can, and a part-loaded 40 foot is usually cheaper and arrives sooner. Ask for both rates before deciding.

Forwarders

The freight forwarder books space, prepares documents and handles the port process.

Open

HS codes

Furniture HS codes split first by material and then by function.

Open

First hour

The first hour on site is a carton count against the packing list, a walk of the dining area with the delivery note in hand, and three cartons opened in front of a camera.

Open

Packing and freight

Cartons, knock-down, container fill, documents and what arrives damaged.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→