LCL or FCL
LCL and full container loading differ in cost per cubic metre and in damage risk.
Open10 October 2026
Shipping transit from south China runs about 18 to 25 days port to port to the west coast and 28 to 35 days to Europe, and door delivery adds a week at each end.
The schedule that counts only the sea leg is a schedule that misses the opening by two weeks. Vessel delays of four days are normal. Port congestion adds time at the destination that the sailing schedule does not show.
The container that sails on the 14th has to be packed by the 10th, which means production finishes by the 8th.
Knock-down packing saves about 45 percent of volume on booth runs. That is the difference between 12 runs in a container and 20, and it moves the landed cost more than any price negotiation. Moisture damage happens in transit. By the time the cartons are opened the timber has already taken the water. The container crossing two climate zones condenses water on the underside of a steel top, and the rust is there when the doors open.
Damage in transit is mostly handling damage, and most of it is at the ends of long pieces. Booth backs and bench rails need end protection. Extra wrapping in the middle protects the part that never gets hit. The failures in transit are condensation, corner impact and load shift. Only one of those is fixed by more wrapping.
Delivery to site is the last mile and the least controlled. Confirm whether the vehicle can reach the door, who unloads and whether there is anywhere to put 20 m³ on arrival. Track the container itself. Vessel delays of four days are normal and invisible until one becomes a missed opening date.
Carton outer dimensions have to clear the container door. Comparing against the internal width alone hides the door height. The carton that fits the floor by 20 mm and misses the door by 40 mm is a carton that gets rebuilt on the dock. Wood packaging needs the heat treatment mark stamped on the pallet. The pallet without an IPPC stamp gets the container held at the destination port for a week. All 829 models are listed on the steakhouse furniture page.
High cube or standard is a volume decision with a weight consequence. The extra 300 mm of height takes another two rows of cartons and raises the centre of gravity, which matters on a short sea leg. Inland trucking has a height limit before it has a weight limit. The container that leaves the port legally can still hit a bridge on the last 30 km, and the route survey is the buyer's job.
Condensation comes from the cargo as much as the air. Timber packed at 14 percent moisture releases water inside a container crossing two climate zones. The desiccant is there for that water. Sea air is not what ruins a carton. Part shipments cost more per unit and less per week. Splitting an order to hit an opening date is normal. Splitting it three ways without telling the forwarder is how the third batch arrives after the opening. Capacity and lead times are explained on the Ember & Chair workshop.
Two weeks between the container arriving and the opening date, which covers a vessel delay and a customs query.
LCL and full container loading differ in cost per cubic metre and in damage risk.
OpenThe freight forwarder books space, prepares documents and handles the port process.
OpenFurniture volume discount is not linear, because the cost structure changes with quantity.
OpenCartons, knock-down, container fill, documents and what arrives damaged.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp