Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Frame joints

The joint carries the load. The glue keeps it closed.

Mortise-and-tenon joints cut 60 mm deep hold a 150 kg static load without a corner block.

Tenon
60 mm deep, wedged through the leg
Glue
cross-linked PVA, 8 hour clamp
Static load
150 kg

What the joint carries

The same rail screwed into end grain moves about 3 mm within a year of nightly dragging. Depth of the tenon decides which of those two chairs you get. Glue only holds what the joint already carries. Screws into end grain pull out at about 400 N, which is one guest leaning back on two chair legs.

Wedged tenons through the leg are the reason a frame can be re-glued in year eight instead of replaced in year three. Knock a joint apart at year eight and the tenon cheeks tell you whether the frame was worth keeping: clean faces mean the glue held until it was opened, torn fibres mean it had already given up.

Where the frame gives first

Moisture in the rail moves a joint more than load does. Kiln dried stock at 8 to 12 percent stays put. Anything wetter shrinks away from the tenon over two seasons and the glue line opens. Drag load is the one that is never designed for. The chair pulled back four times a night for ten years carries more stress through the front leg than a 150 kg guest ever will.

Repair is a design decision made at the drawing stage. Frames built to be re-glued get wedged tenons. Frames built to be thrown away get staples and glue blocks. The underside is where a frame tells the truth. Corner blocks, staple rows and the way a rail meets a leg show in one photograph whether the joint was cut or assembled from a kit.

What to write on the order

Tenon thickness should be a third of the rail it sits in. The 22 mm tenon in a 70 mm rail leaves 24 mm of timber each side, which is what stops the mortise cheek breaking out under a side load. Clamp pressure for a PVA joint is 0.5 to 1 N per square millimetre and it needs 30 minutes before the clamp comes off. The chair assembled and unclamped after five minutes fails at the same tenon in the same year.

Staples into a corner block hold nothing. They are a finishing detail. The block held by glue and two screws resists racking. The block held by five staples resists nothing but gravity.

Stretcher joints take tension rather than compression. That is why a dovetail and a wedge hold where a glued butt joint lets go. Pull a chair sideways and the difference shows in one move. All 829 models are listed on the steakhouse furniture page.

What it costs at year five

Moisture has to be equal across the joint before glue. The rail at 8 percent glued to a leg at 12 percent reaches equilibrium in the dining area and moves 2 mm at the shoulder, which opens a line nobody can close. Pilot holes prevent more splits than any clamp. The screw at 4 mm into a 32 mm rail holds without splitting. The same screw driven without a pilot splits the rail along the grain and the split runs to the end.

The metal corner bracket belongs on a frame that has already failed. The bracket screwed across a corner holds until the screws work loose, and in a chair that is dragged that is one season. Assembly order decides whether the frame goes together under tension. Legs to rails, then seat frame, then back posts, and a frame assembled in another order arrives at the same dimensions with the joints preloaded. Capacity and lead times are explained on the Ember & Chair workshop.

One more question

Can a screwed frame be repaired later?

Screws can be tightened, but the hole widens each turn. After the third there is no thread left, and the rail needs a dowel plug before it will take another screw.

Frame tolerance

Assembly jigs drift by about 1 mm over a production run.

Open

Stapling

Staples at 10 mm centres hold a cover on a hardwood rail and pull out of a softwood one as the timber dries.

Open

Two tops

Steakhouse two tops at 700 mm square give each guest 350 mm of edge and space for two plates and a bread plate.

Open

Chair frames

Joints, glue lines, foam and the parts of a chair that decide year eight.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→