Confirm the vehicle reaches the door before the container sails.

Delivery to site depends on three facts that are rarely checked: whether a vehicle can reach the door, who unloads, and where the goods go on arrival.

Check
vehicle access
Agree
who unloads
Plan
where it goes

What a container holds

The 12 metre vehicle that cannot enter a service yard turns a delivery into a transhipment. Those questions belong in the shipping plan rather than in a phone call on the day. The site with no forklift needs a tail lift, which has to be booked with the vehicle instead of requested at the door.

Delivery outside opening hours is often the only slot available on a busy street, which changes the labour plan.

Where goods get damaged

Marking matters more than most buyers expect. Cartons marked with the dining area they belong to get installed in the right order. Unmarked ones get opened twice. Transit time from South China to the west coast is about 18 to 25 days port to port, and door delivery adds a week. That week is where most schedules slip.

Desiccant is cheap insurance against condensation and is routinely left out. Two 100 g bags per cubic metre in a steel-heavy load is the difference between rust spots and none. The failures in transit are condensation, corner impact and load shift. Only one of those is fixed by more wrapping.

What to specify in packing

The 20 foot container holds about 28 cubic metres and that is the right box for a small order. Filling a 40 foot to a third is paying for air above the goods. Carton outer dimensions have to clear the container door. Comparing against the internal width alone hides the door height. The carton that fits the floor by 20 mm and misses the door by 40 mm is a carton that gets rebuilt on the dock.

High cube or standard is a volume decision with a weight consequence. The extra 300 mm of height takes another two rows of cartons and raises the centre of gravity, which matters on a short sea leg. Inland trucking has a height limit before it has a weight limit. The container that leaves the port legally can still hit a bridge on the last 30 km, and the route survey is the buyer's job. Quotations start from the Ember & Chair range.

What it costs at year five

Delivered duty paid sounds like one number and is really four: freight, duty, clearance and the last mile. The quote that gives one figure without the breakdown is a quote nobody can audit. Unloading equipment belongs in the delivery plan. The 40 foot container of seating needs a dock or a forklift. Without either, the driver waits and the wait is charged by the hour.

Shipping marks go on two faces. The carton turned the wrong way in a container is invisible. The carton marked on the long face only is the carton that gets stacked with the mark against the wall and cannot be found without unloading. Marine insurance has an excess per claim, and it is often larger than a single damaged chair. Knowing the excess explains why small damage is settled by the factory and large damage goes to the insurer. Capacity and lead times are explained on the Ember & Chair workshop.

One more question

What is the most common delivery failure?

Access. The vehicle arrives and cannot reach the door, and the load waits on the street.

Receiving

Warehouse receiving is the first and best inspection point.

Open

Transit

Shipping transit from south China runs about 18 to 25 days port to port to the west coast and 28 to 35 days to Europe, and door delivery adds a week at each end.

Open

Lifts

Lift size decides what goes upstairs in one piece.

Open

Packing and freight

Cartons, knock-down, container fill, documents and what arrives damaged.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.