  • Frame toleranceAssembly jigs drift by about 1 mm over a production run. That is why two chairs from different batches will not swap parts.
  • StaplingStaples at 10 mm centres hold a cover on a hardwood rail and pull out of a softwood one as the timber dries.
  • Frame repairFrames built with wedged tenons can be re-glued twice before the mortise loses its shoulders.
  • Back shellsBacks upholstered over a shaped ply shell hold their curve for the life of the chair. Backs padded over a flat rail flatten within two years.
  • Seat pansSeat pan construction decides whether a chair can be repaired.
  • Load testingThe 150 kg static load on the seat centre says nothing about the front edge, where a guest actually leans.
  • Stacking chairsStacking chairs need 15 mm of clearance between seat and frame at every level, which limits a stack to four or five before the pile becomes unstable.
  • GlidesFelt glides protect a timber floor and wear through in about six months on a chair that is dragged nightly.
  • WeldsWelds on a steel chair frame fail at the toe, where the heat affected zone meets parent metal.
  • CoatingPowder coat at 60 to 80 microns survives a service trolley and a chair dragged across a tiled floor.
  • Moisture contentTimber at 8 to 12 percent moisture content stays where it was machined in a conditioned dining area.
  • Wood speciesBeech at 720 kg per cubic metre takes a screw and a staple without splitting. That is why it is the standard for painted and upholstered frames.
  • Nailhead trimNailhead trim at 15 mm centres holds a cover edge that would otherwise need a stitched seam, and it is applied by hand at about 20 minutes per chair.
  • Welt cordWelt cord in a seam adds a visible line and takes about 4 mm out of the seam allowance.
  • Foam wrappingFoam wrapped in a 15 mm layer of polyester wadding keeps the cover from abrading against the foam core and adds about 2 mm to the seat height.
  • Seat webbingElastic webbing under a 60 mm foam cushion gives a softer seat than a solid deck and costs about a third of the labour.
  • Tenon sizeTenon length at two thirds of the rail width keeps a joint from tearing out the leg.
  • Glue linesCross-linked PVA needs 8 hours in clamp at 20 degrees to reach full strength, and about 30 percent of its final bond is there after 2 hours.
  • Corner blocksCorner blocks glued and screwed into the angle between seat rail and leg add about 30 percent to the racking stiffness of a frame.
  • StretchersStretchers tie the four legs into a frame that resists racking, and rear stretchers sit 180 to 220 mm above the floor so a heel does not find them.
  • Leg sectionFront legs at 32 mm square in beech carry a 150 kg static load with a 60 mm tenon and no visible deflection.
  • Arm heightArm height at 200 to 220 mm above the seat lets a guest sit back without lifting the shoulder, and clears a 750 mm top by 40 mm when the chair is pushed in.
  • Back rakeBack rake between 8 and 12 degrees from vertical keeps a guest upright at a table.
  • Seat foamFoam at 40 kg per cubic metre takes about 400,000 sittings before it loses 15 percent of its height.
  • Frame jointsMortise-and-tenon joints cut 60 mm deep hold a 150 kg static load without a corner block.

Contact

Layout and quote in two working days.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→