Condensation
Container condensation forms where warm moist air meets a cold surface.
Open3 November 2026
The packing list should carry carton count, dimensions, weight, contents by model and the dining area each carton belongs to.
The list that gives only a total tells the receiving dock nothing it needs. The dimensions are also what the forwarder prices against. That is why they are not optional. The dining area reference on a packing list is what turns unloading into a sort instead of a search.
The list with model codes but no carton numbers cannot be reconciled with a claim.
Loose hardware in a carton is a claim waiting to happen. Every screw bag should be inside a labelled bag inside a labelled carton, or the first fix on site stops. Marking matters more than most buyers expect. Cartons marked with the dining area they belong to get installed in the right order. Unmarked ones get opened twice.
Insurance claims need photographs at loading. Unloading photographs show the damage and not the cause. The condition at the port of origin is the baseline, and without it a claim becomes an argument. Knock-down is a packing decision that becomes a quality decision. Every extra joint is a place for a run to rack, so the number of splices should be the minimum the container allows.
Warehouse receiving is the first inspection point. Count cartons against the packing list at the dock, before anything is moved, or the count is unverifiable later. Forwarders who quote a rate without asking about carton dimensions are quoting a guess. Volume, weight and stackability all change the number.
Carton outer dimensions have to clear the container door. Comparing against the internal width alone hides the door height. The carton that fits the floor by 20 mm and misses the door by 40 mm is a carton that gets rebuilt on the dock. Carton weight should stay under 25 kg for two reasons: one person lifts it, and the compression on the bottom carton stays inside what a double wall can take. Sizes, finishes and lead times are set out across steakhouse seating.
Lashing points are part of the packing design. The cartons braced against the container rings travel. The same cartons relying on friction arrive shifted and corner damaged. Unloading equipment belongs in the delivery plan.
The 40 foot container of seating needs a dock or a forklift. Without either, the driver waits and the wait is charged by the hour.
Shipping marks go on two faces. The carton turned the wrong way in a container is invisible. The carton marked on the long face only is the carton that gets stacked with the mark against the wall and cannot be found without unloading. Marine insurance has an excess per claim, and it is often larger than a single damaged chair. Knowing the excess explains why small damage is settled by the factory and large damage goes to the insurer. Capacity and lead times are explained on the Ember & Chair workshop.
The factory, from the actual load. The list prepared from the order instead of the load will not match.
Container condensation forms where warm moist air meets a cold surface.
OpenDelivery to site depends on three facts that are rarely checked: whether a vehicle can reach the door, who unloads, and where the goods go on arrival.
OpenTable base spread sets how far a top can overhang before it tips.
OpenCartons, knock-down, container fill, documents and what arrives damaged.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp