Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Loading photos

Twenty minutes of photographs decides a claim.

Loading photographs are the baseline for any transit damage claim, and they should show the carton condition, the load pattern and the container number.

Show
cartons, load pattern, container number
Taken
before the doors close
Sent
with the documents

Loading arithmetic

Without them, a claim becomes a discussion about when the damage happened. The photographs are taken by the factory and sent with the documents. The photograph of a sealed container proves nothing. The useful one is taken before the doors close.

The container number in the frame links the photographs to the shipment, which is what makes them evidence.

The failures in transit

Moisture damage happens in transit. By the time the cartons are opened the timber has already taken the water. The container crossing two climate zones condenses water on the underside of a steel top, and the rust is there when the doors open. Damage in transit is mostly handling damage, and most of it is at the ends of long pieces.

Booth backs and bench rails need end protection. Extra wrapping in the middle protects the part that never gets hit.

Loose hardware in a carton is a claim waiting to happen. Every screw bag should be inside a labelled bag inside a labelled carton, or the first fix on site stops. Loading sequence is a delivery sequence. Whatever comes off last goes in first, and on a multi-dining area order that is what keeps the install in phase.

What to confirm with the forwarder

Insurance claims need photographs at loading. Unloading photographs show the damage and not the cause. The condition at the port of origin is the baseline, and without it a claim becomes an argument. Knock-down is a packing decision that becomes a quality decision. Every extra joint is a place for a run to rack, so the number of splices should be the minimum the container allows.

The failures in transit are condensation, corner impact and load shift. Only one of those is fixed by more wrapping. Forwarders who quote a rate without asking about carton dimensions are quoting a guess. Volume, weight and stackability all change the number. Every model sits inside the steakhouse range.

What to ask the factory

Carton weight should stay under 25 kg for two reasons: one person lifts it, and the compression on the bottom carton stays inside what a double wall can take. Delivered duty paid sounds like one number and is really four: freight, duty, clearance and the last mile. The quote that gives one figure without the breakdown is a quote nobody can audit.

Shipping marks go on two faces. The carton turned the wrong way in a container is invisible. The carton marked on the long face only is the carton that gets stacked with the mark against the wall and cannot be found without unloading. Marine insurance has an excess per claim, and it is often larger than a single damaged chair. Knowing the excess explains why small damage is settled by the factory and large damage goes to the insurer. Capacity and lead times are explained on the Ember & Chair workshop.

One more question

Who should take them?

The factory at loading, and the buyer should ask for them in the shipping instructions instead of after a problem.

Marks

Shipping marks on furniture cartons should carry the order number, the carton number of the total, the dining area or zone, and the model.

Open

Packing lists

The packing list should carry carton count, dimensions, weight, contents by model and the dining area each carton belongs to.

Open

Short shipment

Short shipment rests on three documents: the packing list, the delivery note and the count taken at the door.

Open

Packing and freight

Cartons, knock-down, container fill, documents and what arrives damaged.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→