Port to door
Port to door delivery adds about seven days to a transit and introduces the last mile.
Open16 September 2026
Customs documents for furniture are the commercial invoice, the packing list, the bill of lading and the certificate of origin, and the errors that cost time are mismatches between them.
The description on the invoice that does not match the entry is a hold, and a hold costs more than the duty. The value declared has to match across all three documents, because a difference is a query instead of a rounding. The description should be specific enough to classify, which means the material and the function instead of the model name.
Knock-down packing saves about 45 percent of volume on booth runs. That is the difference between 12 runs in a container and 20, and it moves the landed cost more than any price negotiation. Weight and volume fill at different rates. The container can be full at 60 percent of its weight limit, and that is what makes furniture a volume business.
Loose hardware in a carton is a claim waiting to happen. Every screw bag should be inside a labelled bag inside a labelled carton, or the first fix on site stops. Insurance claims need photographs at loading. Unloading photographs show the damage and not the cause. The condition at the port of origin is the baseline, and without it a claim becomes an argument.
Knock-down is a packing decision that becomes a quality decision. Every extra joint is a place for a run to rack, so the number of splices should be the minimum the container allows. Desiccant is cheap insurance against condensation and is routinely left out. Two 100 g bags per cubic metre in a steel-heavy load is the difference between rust spots and none.
Customs documentation errors cost more time than duty costs money. The HS code, the description and the value have to match across the invoice, the packing list and the entry. Warehouse receiving is the first inspection point. Count cartons against the packing list at the dock, before anything is moved, or the count is unverifiable later. Every model sits inside the steakhouse range.
Containers are inspected before loading, by hand, with a torch. Light coming through a side panel means water comes through it, and the cargo that arrives wet was loaded into a box with a hole. Pallet footprints should be chosen against the container floor. The 1,200 by 1,000 mm pallet loads eleven across a 40 foot floor. The 1,200 by 800 mm loads fourteen and wastes less of the same box.
Strapping and timber bracing are cheap relative to the goods. Two straps per row and a timber brace at the doors cost a fraction of one damaged booth run. Marine insurance has an excess per claim, and it is often larger than a single damaged chair. Knowing the excess explains why small damage is settled by the factory and large damage goes to the insurer. Capacity and lead times are explained on the Ember & Chair workshop.
The seller prepares the invoice and packing list, the forwarder issues the bill, and the buyer's broker files the entry.
Port to door delivery adds about seven days to a transit and introduces the last mile.
OpenDesiccant in a shipping container runs at about 200 grams per cubic metre of load for a 30 day transit, which for a 68 cubic metre container is roughly 14 kilograms.
OpenReorder colour matching fails across three materials at once: hide, powder coat and stain.
OpenCartons, knock-down, container fill, documents and what arrives damaged.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp