Filler panels
Banquette filler panels close the gap between a run and an out-of-square wall.
Open30 September 2026
Booth runs are built level in the workshop, so any fall in the floor appears as a gap under one end of the plinth.
The 25 mm fall across 6 m is normal in an older building. Packing that gap is a fit-out job, and it belongs in the programme rather than in the furniture quote. Levelling feet inside a plinth solve a floor fall up to about 15 mm and are invisible once the run is down, which is the cheapest route when the fall is even.
Packing under a plinth after the run is fixed puts the frame in a twist, so the packing goes in first and the fixing follows.
Level is the whole job on a timber floor. The run built true and installed on a floor with a 25 mm fall shows a gap at one end that no amount of tightening will close. Upholstery on a fixed seat is stretched over a frame that never moves, so the cover takes all the wear. That is why booth covers last longer than chair covers and why a recover is worth doing on a sound frame.
Filler panels belong in the furniture quote. Left to another trade they arrive late and fit badly. The run scribed to a wall leaves a 30 mm line, and covering it is a panel cut at the factory. Delivery sequence matters on a booth more than on a chair. The 2.4 m run that arrives before the floor is finished has to be moved twice, and the second move is where corners get damaged.
Two seats on a banquette need 1,200 mm of run to sit properly, and 1,100 mm to be acceptable. Below that, shoulders touch. The second seat then goes unused at full occupancy, which is a cover paid for and never sold.
Filler panels are what make a run read as built-in. The 18 mm panel scribed between the last booth and the wall costs almost nothing. It removes the gap every guest sees on the way in.
Cushion fixing is a cleaning decision. Removable cushions get cleaned and go back crooked. Fixed cushions clean badly and stay straight. The choice belongs to whoever runs the floor.
Knock-down booths save freight volume and cost stiffness. Every splice is a joint that can rack. The run built in two pieces should splice where the wall turns, or where a leg frame carries it.
Re-covering a booth is worth doing when the frame is sound and the foam is not. Foam at year eight has lost about a third of its height at the entry line. New foam on the same frame costs about half of new seating. All 829 models are listed on the steakhouse furniture page.
Table brackets on a booth carry the whole table load into the seat frame, and the frame has to be built for it. The bracket screwed into an 18 mm panel pulls out at the first lean. One screwed into a 40 mm rail holds.
Uneven floors are the normal case. The run with adjustable feet and a 25 mm scribe allowance installs in a day. The run built to nominal needs the floor ground, and the opening date moves with it.
The long run needs movement in its wall fixing. Bolted hard at both ends, a 6 m run cracks the plaster when the timber takes on the season. Fixed at one end and slotted at the other, it moves and stays closed. The workshop floor is described on our workshop.
Only where the floor cannot be packed. Building a run out of level means every later change to the dining area inherits the mistake.
Banquette filler panels close the gap between a run and an out-of-square wall.
OpenBench legs carry a distributed load along the seat and a point load at each end where a guest stands up.
OpenFurniture factory audit checks the workshop instead of the showroom: cutting, machining, upholstery.
OpenDepth, back angle, plinths and the joints that let a run follow a wall.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp