Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Checking a plan

Count the chairs on the plan and then count the aisles.

Seat count verification is a two part check: count the seats and then check the clear widths.

Check one
seat count
Check two
clear widths
Scale
print at 1:50

Body against furniture

The plan can hold the seats and fail the 1,100 mm service aisle, which shows up as a dining area that seats the number on opening night and fewer by the second week. Verifying before the furniture is ordered costs an hour. The check should be done on a printed plan at 1:50, because a screen zooms and hides the clearance that matters.

Ask for the aisle widths to be written on the plan, because a drawing without them is a drawing that has not been checked.

The errors that cost covers

Pitch per cover is 600 mm for a loose chair and 1,100 to 1,200 mm for two on a banquette. Those are different numbers for the same person because the arm and shoulder clearance differs. Aisle width for service is 1,100 mm where a tray passes a seated guest, and 900 mm where nobody passes. Dining areas designed at 900 mm everywhere lose covers to the first busy night.

Door widths under 900 mm rule out assembled runs. That is a freight and installation decision made at the drawing stage, and it cannot be fixed later without cutting furniture. Send the seat count and the aisle widths. Area divided by a pitch number always produces a count that cannot be laid out.

What to write down

Confirm which wall is the reference. On a dining area with two out-of-square walls, one has to be nominated, and the run follows it. Round numbers in a brief are a warning sign. The 4 m wall measures 3,980 mm, and 20 mm across six seats is a seat that does not fit.

Ask for a dimensioned layout back before the deposit. That drawing is where errors are cheap. After cutting they are not. Standing space at the counter is 600 mm of width per person and 300 mm of overhang. Below either number the counter stops being usable at a busy service. All 829 models are listed on the steakhouse furniture page.

What to ask the factory

Every dimension on a plan should have a tolerance. ±2 mm is achievable in a workshop. ±0 on site is not, and a plan that assumes it will fail at handover. Two tops need 1,700 by 1,400 mm each including circulation.

The table itself is 700 mm. The other 1,000 mm is the chair, the pull out and the aisle share, and it is the part that gets forgotten in a layout.

Service routes should not cross guest routes. The path from the pass to the far corner that runs through the entry puts a server and an arriving party in the same square metre every service. The pass to the furthest cover should be under 20 metres. The dining area where it is 30 metres runs on two extra staff and the food arrives colder at the same tables every night. Tops and bases are listed under steakhouse grill tables.

One more question

Who should verify the plan?

The person who will run the dining area, before the deposit. The workshop can build to a plan. How the dining area is served is a question only the operator can answer.

Booth entry

Booth entry width is the clear gap between the end of a run and the next fixed object.

Open

Pull-out

Chair pull-out space is the 600 mm behind a chair that a guest uses to get in.

Open

The form

The inspection report is one page per carton with five fields: carton number, model, quantity.

Open

Sizes and ergonomics

Seat height, pitch, clearance and the subtraction that gives a real cover count.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→