Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Loading

The last piece off the container is the first one built.

Container loading sequence should follow the installation sequence, because the container is unloaded in reverse.

Order
reverse of installation
Marking
dining area on each carton
Constraint
heavy at the bottom

Loading arithmetic

On a multi-dining area order, the dining area that is fitted first goes in last. The load built for fill rate rather than for delivery order costs a day of double handling at the far end. The load plan that shows the dining area against each carton turns unloading into a sort instead of a search.

Heavy items at the bottom and light ones at the top is the other constraint, and it occasionally conflicts with the sequence.

The failures in transit

The 40 foot container holds about 68 cubic metres. At 0.19 m³ per packed chair that is roughly 320 chairs, and the number drops the moment a base or a stone top goes in. Spares packed separately get lost. Spares packed inside the last carton arrive with the order because they are part of it.

Palletising raises density and lowers handling damage. It also raises the floor space needed at the destination, which is a warehouse constraint instead of a shipping one. Marking matters more than most buyers expect. Cartons marked with the dining area they belong to get installed in the right order. Unmarked ones get opened twice.

What to confirm with the forwarder

Loading sequence is a delivery sequence. Whatever comes off last goes in first, and on a multi-dining area order that is what keeps the install in phase. Load plans are worth asking for before shipping. It shows the fill rate, the weight distribution and whether the last ten cartons actually fit.

Carton dimensions are chosen against the container. The carton sized to the product alone wastes the space above it. Cartons that fit a product and waste 60 mm of container height waste more than they save. Fill rate is a design constraint. Table bases that nest save more container space than a 5 percent price cut saves money. Every model sits inside the steakhouse range.

What to ask the factory

Carton weight should stay under 25 kg for two reasons: one person lifts it, and the compression on the bottom carton stays inside what a double wall can take. Unloading equipment belongs in the delivery plan. The 40 foot container of seating needs a dock or a forklift. Without either, the driver waits and the wait is charged by the hour.

The packing list should match the load, carton by carton. The container closed with 312 cartons against a list of 310 is a discrepancy that gets found at the destination, when nobody can check the dock. Damage clusters at both ends of the journey. Loading damage shows as crushed corners at the door end. Unloading damage shows as scrapes on the cartons handled last. Capacity and lead times are explained on the Ember & Chair workshop.

One more question

Who should plan the load?

The factory, against the installation sequence the buyer provides. Without the sequence it is a fill exercise.

Weight

Container weight limit for a 40HQ is about 26 tonnes of cargo, and furniture reaches full volume at about 15 tonnes.

Open

Pallets

Palletising furniture raises the fill rate because cartons stack squarely.

Open

Chips

Powder coat chip repair is a touch-in pen matched to the batch, applied in two thin coats instead of one thick one.

Open

Packing and freight

Cartons, knock-down, container fill, documents and what arrives damaged.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→