Seam placement
Booth upholstery seams placed on the front edge of a seat take the abrasion of every guest sliding in, which is where a cover fails first.
Open30 October 2026
Booth runs fixed to the floor reduce the clear width of a dining area, so egress is calculated on what is left instead of on the seat count.
The run that projects 700 mm into a 1,200 mm aisle leaves 500 mm, which is below the width a dining area needs. Cover specification and fixing method both come up in a fire review. Covers can be specified with a fire-retardant treatment, and the treatment changes the hand of a hide, so it belongs in the sample instead of in a later substitution.
Fixed seating cannot be moved for an inspection, so the drawing has to show the clear width with the run in place.
Wall fixing decides what the dining area can be changed into later. Bolted runs cannot move without making good. Counterweighted runs can be re-laid in an afternoon. What to send is the wall length, the floor-to-window height, the position of every socket and the table layout. Everything else a factory can work out, but those four cannot be guessed.
Delivery sequence matters on a booth more than on a chair. The 2.4 m run that arrives before the floor is finished has to be moved twice, and the second move is where corners get damaged.
Two seats on a banquette need 1,200 mm of run to sit properly, and 1,100 mm to be acceptable. Below that, shoulders touch. The second seat then goes unused at full occupancy, which is a cover paid for and never sold.
Bench seat width runs 550 mm per person at a wall, and 500 mm at a push. Bench seating packs tighter than loose chairs because there is no arm to mark the boundary. That is exactly why the number belongs in writing.
Cushion fixing is a cleaning decision. Removable cushions get cleaned and go back crooked. Fixed cushions clean badly and stay straight. The choice belongs to whoever runs the floor.
Entry width gets designed last and noticed first. Below 600 mm clear, guests turn sideways to get in. The fourth seat of a four-top then stops being used.
Fire requirements for fixed seating are a building question with a furniture answer. Foam specification and cover treatment both get asked for. Both have to be on the quotation before the drawing is approved.
The plinth decides how a booth meets the floor for the next ten years. The recessed plinth at 20 mm keeps the mop away from the cover. The flush plinth takes the water and every kick. All 829 models are listed on the steakhouse furniture page.
Storage under a booth seat runs to 120 mm of depth before the frame has to change. Below that a drawer takes napkins and little else. In a steakhouse with no back of house that is still worth having.
Uneven floors are the normal case. The run with adjustable feet and a 25 mm scribe allowance installs in a day. The run built to nominal needs the floor ground, and the opening date moves with it.
The long run needs movement in its wall fixing. Bolted hard at both ends, a 6 m run cracks the plaster when the timber takes on the season. Fixed at one end and slotted at the other, it moves and stays closed. The workshop floor is described on our workshop.
Not every one, and the ones that do are set by the dining area's review instead of by the furniture. Ask before the sample is approved. After approval a change costs a new sample.
Booth upholstery seams placed on the front edge of a seat take the abrasion of every guest sliding in, which is where a cover fails first.
OpenBooth seats can hinge to give storage under the deck, which is useful in a dining area with no back of house and adds about 25 mm to the seat height.
OpenSeat slope runs from flat to about 5 degrees towards the back.
OpenDepth, back angle, plinths and the joints that let a run follow a wall.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp